TSX: WPM
NYSE: WPM
VANCOUVER, British Columbia, May 9, 2019 /PRNewswire/ -- Wheaton Precious Metals™ Corp. ("Wheaton" or the "Company") is pleased to announce its results for the first quarter ended March 31, 2019. All figures are presented in United States dollars unless otherwise noted.
In the first quarter of 2019, Wheaton generated almost $120 million in operating cash flow, driven by record gold sales volumes.
Operational Overview
Q1 2019 |
Q1 2018 |
Change |
||||||
Ounces produced |
||||||||
Gold |
93,585 |
76,691 |
22.0 % |
|||||
Silver |
5,614 |
7,414 |
(24.3)% |
|||||
Palladium |
4,729 |
- |
n.a. |
|||||
Ounces sold |
||||||||
Gold |
115,020 |
69,973 |
64.4 % |
|||||
Silver |
4,294 |
6,343 |
(32.3)% |
|||||
Palladium |
5,189 |
- |
n.a. |
|||||
Sales price per ounce |
||||||||
Gold |
$ |
1,308 |
$ |
1,330 |
(1.7)% |
|||
Silver |
$ |
15.64 |
$ |
16.73 |
(6.5)% |
|||
Palladium |
$ |
1,443 |
$ |
n.a. |
n.a. |
|||
Cash costs per ounce 1 |
||||||||
Gold 1 |
$ |
417 |
$ |
399 |
4.5 % |
|||
Silver 1 |
$ |
4.64 |
$ |
4.49 |
3.3 % |
|||
Palladium 1 |
$ |
254 |
$ |
n.a. |
n.a. |
|||
Cash operating margin per ounce 1 |
||||||||
Gold 1 |
$ |
891 |
$ |
931 |
(4.3)% |
|||
Silver 1 |
$ |
11.00 |
$ |
12.24 |
(10.1)% |
|||
Palladium 1 |
$ |
1,189 |
$ |
n.a. |
n.a. |
|||
Revenue |
$ |
225,049 |
$ |
199,252 |
12.9 % |
|||
Net earnings (loss) |
$ |
57,349 |
$ |
68,123 |
(15.8)% |
|||
Per share |
$ |
0.13 |
$ |
0.15 |
(13.3)% |
|||
Adjusted net earnings 1 |
$ |
56,540 |
$ |
69,563 |
(18.7)% |
|||
Per share 1 |
$ |
0.13 |
$ |
0.16 |
(19.0)% |
|||
Operating cash flows |
$ |
118,194 |
$ |
125,340 |
(5.7)% |
|||
Per share 1 |
$ |
0.27 |
$ |
0.28 |
(3.6)% |
|||
Dividends declared 1 |
$ |
40,074 |
$ |
39,851 |
0.6 % |
|||
Per share |
$ |
0.09 |
$ |
0.09 |
0.0 % |
All amounts in thousands except gold and palladium ounces produced and sold, per ounce amounts and per share amounts.1 |
Highlights
"Wheaton's core assets delivered strong results in the first quarter of 2019 with gold sales exceeding 115,000 ounces—the most gold we have ever sold in a single quarter," said Randy Smallwood, President and Chief Executive Officer of Wheaton Precious Metals. "In addition, we also saw one of our key growth projects move forward with Hudbay announcing the conclusion of the permitting process at Rosemont and their intent to begin early development work later this year. Hudbay indicated first production could commence as early as 2022, and we look forward to Rosemont contributing to our future growth profile."
Financial Review
Revenues
Revenue was $225 million in the first quarter of 2019, on sales volume of 115,000 ounces of gold, 4.3 million ounces of silver and 5,200 ounces of palladium. This represents a 13% increase from the $199 million of revenue generated in the first quarter of 2018 due primarily to (i) a 64% increase in the number of gold ounces sold; and (ii) the introduction of palladium sales effective Q3 2018, partially offset by (iii) a 32% decrease in the number of silver ounces sold, (iv) a 7% decrease in the average realized silver price ($15.64 in Q1 2019 compared with $16.73 in Q1 2018); and (v) a 2% decrease in the average realized gold price ($1,308 in Q1 2019 compared with $1,330 in Q1 2018).
Costs and Expenses
Average cash costs¹ in the first quarter of 2019 were $417 per gold ounce sold, $4.64 per silver ounce sold and $254 per palladium ounce sold, as compared with $399 per gold ounce and $4.49 per silver ounce during the comparable period of 2018. This resulted in a cash operating margin¹ of $891 per gold ounce sold, $11.00 per silver ounce sold and $1,189 per palladium ounce sold, a reduction of 4% and 10% for gold and silver, respectively, as compared with Q1 2018. The decrease in the cash operating margin was primarily due to a 2% decrease in the average realized gold price and a 7% decrease in the average realized silver price in Q1 2019 compared with Q1 2018.
Earnings and Operating Cash Flows
Adjusted net earnings¹ and cash flow from operations in the first quarter of 2019 were $57 million ($0.13 per share) and $118 million ($0.27 per share¹), compared with adjusted net earnings¹ of $70 million ($0.16 per share) and cash flow from operations of $125 million ($0.28 per share¹) for the same period in 2018, a decrease of 19% and 6%, respectively.
Balance Sheet
At March 31, 2019, the Company had approximately $126 million of cash on hand and $1.2 billion outstanding under the Company's $2 billion revolving term loan (the "Revolving Facility"). The average effective interest rate for the first quarter of 2019 was 4.28%.
First Quarter Asset Highlights
During the first quarter of 2019 attributable production was 93,600 ounces of gold, 5.6 million ounces of silver and 4,700 ounces of palladium, representing an increase of 22% and a decrease of 24% for gold and silver, respectively, as compared with the first quarter of 2018.
Operational highlights for the quarter ended March 31, 2019, are as follows:
Salobo
In the first quarter of 2019, Salobo produced 60,800 ounces of attributable gold, in line with the first quarter of 2018 as lower throughput and grades were offset by higher recoveries. Sales of 84,160 ounces of gold in the first quarter of 2019 were higher than production as a result of a significant draw down of produced but not yet delivered ounces.
Peñasquito
In the first quarter of 2019, Peñasquito produced 1.6 million ounces of attributable silver, an increase of approximately 10% relative to the first quarter of 2018 primarily due to higher grades partially offset by lower throughput and recovery as higher than expected ore hardness impacted mill performance in the quarter. Following the start of commercial production on December 31, 2018, the Pyrite Leach Project was operated successfully through the quarter.
In April 2019, Newmont Mining Corporation and Goldcorp Inc. merged to form Newmont Goldcorp Corporation ("Newmont Goldcorp"). Newmont Goldcorp has highlighted their expected future improvements are focused on increasing mill throughput and improving plant reliability at Peñasquito.
Subsequent to the quarter, on April 29, 2019, Newmont Goldcorp announced that it intended to temporarily suspend operations at the Peñasquito mine pending resolution of an illegal blockade.
Antamina
In the first quarter of 2019, Antamina produced 1.2 million ounces of attributable silver, a decrease of approximately 10% relative to the first quarter of 2018 as expected due to mine sequencing in the open pit and lower mill throughput as a result of the timing of maintenance.
San Dimas
In the first quarter of 2019, San Dimas produced 10,300 ounces of attributable gold. According to First Majestic Silver Corp.'s ("First Majestic") first quarter of 2019 production report, the San Dimas mill processed a total of 163,264 tonnes with average silver and gold grades of 287 g/t and 4.18 g/t, respectively. According to First Majestic, silver and gold grades improved 10% and 8%, respectively, compared to the prior quarter due to higher grades in the Victoria and Jessica areas along with improvements in mine dilution controls.
Sudbury
In the first quarter of 2019, Vale's Sudbury mines produced 10,000 ounces of attributable gold, an increase of approximately 186% relative to the first quarter of 2018 primarily due to higher throughput. As a reminder, production in the first quarter of 2018 was impacted due to the Coleman mine being shutdown down for unscheduled maintenance from November 2017 to April 2018.
Constancia
In the first quarter of 2019, Constancia produced 0.6 million ounces of attributable silver and 4,800 ounces of attributable gold, a decrease of approximately 2% for silver production and an increase of approximately 46% for gold production relative to the first quarter of 2018. As per Wheaton's precious metals purchase agreement with Hudbay relating to Constancia (the "Constancia PMPA"), should Hudbay fail to achieve a minimum level of throughput at the Pampacancha satellite deposit during 2018, 2019 and 2020, Wheaton will be entitled to an increased portion of gold from Hudbay. As per Hudbay's MD&A for the first quarter of 2019, mining of the Pampacancha deposit is not expected to begin until 2020. Assuming ore production does not begin until 2020, the Company will be entitled to receive an additional 8,020 ounces of gold in 2019 and 2020 relative to the Constancia PMPA, with the deliveries to be made in quarterly installments, of which 2,005 ounces were received during the first quarter of 2019 and reported as production.
Stillwater
In the first quarter of 2019, the Stillwater mines produced 3,100 ounces of attributable gold and 4,700 ounces of attributable palladium. While production was slightly lower than expected due to several factors, Sibanye-Stillwater has indicated that additional resources have been deployed with the focus on recovering the lower production over the remainder of the year.
Other Gold
In the first quarter of 2019, total Other Gold attributable production was 4,400 ounces, a decrease of approximately 47% relative to the first quarter of 2018. The decrease was due primarily to lower production at the Minto mine which was placed on care and maintenance in the fourth quarter of 2018 and lower production from the 777 mine.
Other Silver
In the first quarter of 2019, total Other Silver attributable production was 2.3 million ounces, a decrease of approximately 8% relative to the first quarter of 2018. The decrease was driven primarily by the cessation of attributable production from the Lagunas Norte, Veladero and Pierina mines as these streaming interests expired on March 31, 2018, in accordance with the PMPA with Barrick Gold Corp. ("Barrick"), partially offset by the start-up of attributable production at the Aljustrel mine in the second quarter of 2018.
Development Update - Rosemont
In March 2019, Hudbay announced the conclusion of the permitting process for Rosemont with its receipt of the Section 404 Water Permit from the U.S. Army Corps of Engineers and the MPO from the U.S. Forest Service. On March 28, 2019, Hudbay indicated that it plans to move ahead with an early works program and financing activities in parallel in 2019 and expects to seek from its board approval to commence the construction of Rosemont by the end of the year, which should enable first production by the end of 2022. The early works program includes construction of a water pipeline and power transmission line to site, advancing critical path engineering and geotechnical work, archaeological site work, and spending on permit-related mitigation activities. Hudbay further reports that it intends to evaluate a variety of financing options, including the addition of a new, committed joint venture partner for the development of Rosemont.
As a reminder, Wheaton has a precious metals purchase agreement with Hudbay on Rosemont, which in consideration for total upfront payments of $230 million, entitles the Company to 100% of payable silver and gold produced from Rosemont at a cash price of $450 per ounce of gold and $3.90 per ounce of silver, subject to an annual adjustment for inflation.
Produced But Not Yet Delivered 2
As at March 31, 2019, payable ounces attributable to the Company produced but not yet delivered amounted to 51,500 payable gold ounces, 3.5 million payable silver ounces and 4,800 payable palladium ounces, representing a decrease of 25,600 payable gold ounces, an increase of 0.4 million payable silver ounces and a decrease of 500 payable palladium ounces during the three month period ended March 31, 2019. Payable gold ounces produced but not yet delivered decreased primarily as a result of a decrease related to the Salobo gold interest partially offset by an increase related to the Sudbury gold interest. Payable silver ounces produced but not yet delivered increased slightly primarily as a result of increases related to the Yauliyacu and Peñasquito silver interests partially offset by a decrease related to the Constancia silver interest. Payable ounces produced but not yet delivered to the Wheaton group of companies are expected to average approximately two months of annualized production for silver and two to three months for both gold and palladium but may vary from quarter to quarter due to a number of mining operation factors including mine ramp-up and timing of shipments.
Detailed mine-by-mine production and sales figures can be found in the Appendix to this press release and in Wheaton's consolidated MD&A in the 'Results of Operations and Operational Review' section.
Dividend
Second Quarterly Dividend
The second quarterly cash dividend for 2019 of US$0.09 will be paid to holders of record of Wheaton Precious Metals common shares as of the close of business on May 24, 2019 and will be distributed on or about June 6, 2019.
Under the Company's dividend policy, the quarterly dividend per common share is targeted to equal approximately 30% of the average cash generated by operating activities in the previous four quarters divided by the Company's then outstanding common shares, all rounded to the nearest cent. To minimize volatility in quarterly dividends, the Company has set a minimum quarterly dividend of $0.09 per common share for the duration of 2019.
The declaration, timing, amount and payment of future dividends remain at the discretion of the Board of Directors. This dividend qualifies as an 'eligible dividend' for Canadian income tax purposes.
Dividend Reinvestment Plan
The Company has previously implemented a Dividend Reinvestment Plan ("DRIP"). Participation in the DRIP is optional. For the purposes of this second quarterly dividend, the Company has elected to issue common shares under the DRIP through treasury at a 3% discount to the Average Market Price, as defined in the DRIP. However, the Company may, from time to time, in its discretion, change or eliminate the discount applicable to Treasury Acquisitions, as defined in the DRIP, or direct that such common shares be purchased in Market Acquisitions, as defined in the DRIP, at the prevailing market price, any of which would be publicly announced.
The DRIP and enrollment forms, including direct deposit, are available for download on the Company's website at www.wheatonpm.com, accessible by quick links directly from the home page, and can also be found in the 'investors' section, under the 'dividends' tab.
Registered shareholders may also enroll in the DRIP online through the plan agent's self-service web portal at: https://www.canstockta.com/en/InvestorServices/Investor_Information/Issuer_List/IssuerDetail.jsp?companyCode=1501.
Beneficial shareholders should contact their financial intermediary to arrange enrollment. All shareholders considering enrollment in the DRIP should carefully review the terms of the DRIP and consult with their advisors as to the implications of enrollment in the DRIP.
This press release is not an offer to sell or a solicitation of an offer of securities. A registration statement relating to the DRIP has been filed with the U.S. Securities and Exchange Commission and may be obtained under the Company's profile on the U.S. Securities and Exchange Commission's website at http://www.sec.gov. A written copy of the prospectus included in the registration statement may be obtained by contacting the Corporate Secretary of the Company at 1021 West Hastings Street, Suite 3500, Vancouver, British Columbia, Canada V6E 0C3.
Outlook
Wheaton's forecast production for 2019 and for the average annual production over the next five years remain unchanged. In 2019, Wheaton's production is forecast to be approximately 365,000 ounces of gold, 24.5 million ounces of silver and 22,000 ounces of palladium, resulting in gold equivalent production3 of approximately 690,000 ounces. For the five-year period ending in 2023, the Company estimates that average annual gold equivalent production3 will amount to 750,000 ounces. As a reminder, Wheaton does not currently include any production from Hudbay's Rosemont project nor the announced expansion at Salobo in its estimated average five-year production guidance4.
From a liquidity perspective, the $126 million of cash and cash equivalents as at March 31, 2019, combined with the liquidity provided by the available credit under the $2 billion Revolving Facility and ongoing operating cash flows positions the Company well to fund all outstanding commitments and known contingencies as well as providing flexibility to acquire additional accretive precious metal stream interests.
Webcast and Conference Call Details
A conference call and webcast will be held Thursday, May 9, 2019, starting at 11:00 am (Eastern Time) to discuss these results. To participate in the live call, please use one of the following methods:
Dial toll free from Canada or the US: |
888-231-8191 |
Dial from outside Canada or the US: |
647-427-7450 |
Pass code: |
7896205 |
Live audio webcast: |
Participants should dial in five to ten minutes before the call.
The conference call will be recorded and available until May 16, 2019 at 11:59 pm (Eastern Time). The webcast will be available for one year. You can listen to an archive of the call by one of the following methods:
Dial toll free from Canada or the US: |
855-859-2056 |
Dial from outside Canada or the US: |
416-849-0833 |
Pass code: |
7896205 |
Archived audio webcast: |
This earnings release should be read in conjunction with Wheaton Precious Metals' MD&A and Financial Statements, which are available on the Company's website at www.wheatonpm.com and have been posted on SEDAR at www.sedar.com.
Mr. Wes Carson, P. Eng., Vice President, Mining Operations is a "qualified person" as such term is defined under National Instrument 43-101, and has reviewed and approved the technical information disclosed in this news release.
Wheaton Precious Metals believes that there are no significant differences between its corporate governance practices and those required to be followed by United States domestic issuers under the NYSE listing standards. This confirmation is located on the Wheaton Precious Metals website at http://www.wheatonpm.com/Company/corporate-governance/default.aspx
End Notes
________________________ |
1 Please refer to non-IFRS measures at the end of this press release. Dividends declared in the referenced calendar quarter, relative to the financial results of the prior quarter. |
2 Payable gold, silver and palladium ounces produced but not yet delivered are based on management estimates and may be updated in future periods as additional information is received. |
3 Gold equivalent production forecasts for 2019 and the five-year average are based on the following commodity price assumptions: $1,300 / ounce gold, $16 / ounce silver, $1,350 / ounce palladium, and $21 / pound of cobalt. |
4 In preparing the long-term production forecast, Wheaton has considered the impact of Vale's announced approval of the Salobo III copper project, a brownfield expansion, which if completed as proposed, would increase processing throughput capacity from 24 Mtpa to 36 Mtpa once fully ramped up (the "Salobo Expansion"). However, readers are cautioned that Vale has not finalized its mine plan and as such, Wheaton has not included any production growth as a result of the Salobo Expansion. |
Condensed Interim Condensed Interim Consolidated Statements of Earnings
Three Months Ended |
|||||
(US dollars and shares in thousands, except per share amounts - unaudited) |
2019 |
2018 |
|||
Sales |
$ |
225,049 |
$ |
199,252 |
|
Cost of sales |
|||||
Cost of sales, excluding depletion |
$ |
69,214 |
$ |
56,414 |
|
Depletion |
68,381 |
57,265 |
|||
Total cost of sales |
$ |
137,595 |
$ |
113,679 |
|
Gross margin |
$ |
87,454 |
$ |
85,573 |
|
General and administrative 1 |
16,535 |
9,757 |
|||
Earnings from operations |
$ |
70,919 |
$ |
75,816 |
|
Other (income) expense |
(266) |
1,071 |
|||
Earnings before finance costs and income taxes |
$ |
71,185 |
$ |
74,745 |
|
Finance costs |
13,946 |
7,107 |
|||
Earnings before income taxes |
$ |
57,239 |
$ |
67,638 |
|
Income tax recovery |
110 |
485 |
|||
Net earnings |
$ |
57,349 |
$ |
68,123 |
|
Basic earnings per share |
$ |
0.13 |
$ |
0.15 |
|
Diluted earnings per share |
$ |
0.13 |
$ |
0.15 |
|
Weighted average number of shares outstanding |
|||||
Basic |
444,389 |
442,728 |
|||
Diluted |
445,121 |
443,181 |
|||
1) Equity settled stock based compensation (a non-cash item) included in general and administrative expenses. |
$ |
1,357 |
$ |
1,249 |
Condensed Interim Condensed Interim Consolidated Balance Sheets
As at |
As at |
|||
(US dollars in thousands - unaudited) |
2019 |
2018 |
||
Assets |
||||
Current assets |
||||
Cash and cash equivalents |
$ |
125,781 |
$ |
75,767 |
Accounts receivable |
1,998 |
2,396 |
||
Other |
1,478 |
1,541 |
||
Total current assets |
$ |
129,257 |
$ |
79,704 |
Non-current assets |
||||
Mineral stream interests |
$ |
6,088,454 |
$ |
6,156,839 |
Early deposit mineral stream interests |
30,241 |
30,241 |
||
Mineral royalty interest |
9,107 |
9,107 |
||
Long-term equity investments |
185,400 |
164,753 |
||
Investment in associates |
2,500 |
2,562 |
||
Convertible note receivable |
13,770 |
12,899 |
||
Property, plant and equipment |
7,925 |
3,626 |
||
Other |
12,046 |
10,315 |
||
Total non-current assets |
$ |
6,349,443 |
$ |
6,390,342 |
Total assets |
$ |
6,478,700 |
$ |
6,470,046 |
Liabilities |
||||
Current liabilities |
||||
Accounts payable and accrued liabilities |
$ |
14,120 |
$ |
19,883 |
Dividends payable |
40,074 |
- |
||
Current taxes payable |
- |
3,361 |
||
Current portion of performance share units |
7,519 |
5,578 |
||
Current portion of lease liabilities |
627 |
- |
||
Other |
18 |
19 |
||
Total current liabilities |
$ |
62,358 |
$ |
28,841 |
Non-current liabilities |
||||
Bank debt |
$ |
1,183,500 |
$ |
1,264,000 |
Lease liabilities |
3,945 |
- |
||
Deferred income taxes |
119 |
111 |
||
Performance share units |
2,830 |
5,178 |
||
Total non-current liabilities |
$ |
1,190,394 |
$ |
1,269,289 |
Total liabilities |
$ |
1,252,752 |
$ |
1,298,130 |
Shareholders' equity |
||||
Issued capital |
$ |
3,537,833 |
$ |
3,516,437 |
Reserves |
23,254 |
7,893 |
||
Retained earnings |
1,664,861 |
1,647,586 |
||
Total shareholders' equity |
$ |
5,225,948 |
$ |
5,171,916 |
Total liabilities and shareholders' equity |
$ |
6,478,700 |
$ |
6,470,046 |
Condensed Interim Consolidated Statements of Cash Flows
Three Months Ended |
|||||
(US dollars in thousands - unaudited) |
2019 |
2018 |
|||
Operating activities |
|||||
Net earnings |
$ |
57,349 |
$ |
68,123 |
|
Adjustments for |
|||||
Depreciation and depletion |
68,874 |
57,505 |
|||
Interest expense |
13,152 |
5,591 |
|||
Equity settled stock based compensation |
1,357 |
1,249 |
|||
Performance share units |
(592) |
184 |
|||
Income tax expense (recovery) |
(110) |
(485) |
|||
Loss on fair value adjustment of share purchase warrants held |
- |
99 |
|||
Share in losses of associate |
62 |
201 |
|||
Fair value (gain) loss on convertible note receivable |
(871) |
1,388 |
|||
Investment income recognized in net earnings |
(242) |
(203) |
|||
Other |
428 |
226 |
|||
Change in non-cash working capital |
(7,170) |
(3,075) |
|||
Cash generated from operations before income taxes and interest |
$ |
132,237 |
$ |
130,803 |
|
Income taxes paid |
(3,562) |
(50) |
|||
Interest paid |
(10,707) |
(5,596) |
|||
Interest received |
226 |
183 |
|||
Cash generated from operating activities |
$ |
118,194 |
$ |
125,340 |
|
Financing activities |
|||||
Bank debt repaid |
$ |
(80,500) |
$ |
(107,000) |
|
Credit facility extension fees |
(1,100) |
(1,200) |
|||
Share purchase options exercised |
14,891 |
149 |
|||
Lease payments |
(170) |
- |
|||
Cash (used for) generated from financing activities |
$ |
(66,879) |
$ |
(108,051) |
|
Investing activities |
|||||
Mineral stream interests |
$ |
(174) |
$ |
- |
|
Early deposit mineral stream interests |
- |
(203) |
|||
Dividend income received |
16 |
20 |
|||
Other |
(1,154) |
(41) |
|||
Cash used for investing activities |
$ |
(1,312) |
$ |
(224) |
|
Effect of exchange rate changes on cash and cash equivalents |
$ |
11 |
$ |
(18) |
|
Increase in cash and cash equivalents |
$ |
50,014 |
$ |
17,047 |
|
Cash and cash equivalents, beginning of period |
75,767 |
98,521 |
|||
Cash and cash equivalents, end of period |
$ |
125,781 |
$ |
115,568 |
Summary of Ounces Produced
Q1 2019 |
Q4 2018 |
Q3 2018 |
Q2 2018 |
Q1 2018 |
Q4 2017 |
Q3 2017 |
Q2 2017 |
|||
Gold ounces produced ² |
||||||||||
Sudbury 3 |
10,041 |
6,646 |
6,510 |
6,476 |
3,511 |
8,568 |
8,519 |
7,468 |
||
Salobo |
60,846 |
76,995 |
68,648 |
63,949 |
61,513 |
76,153 |
72,980 |
57,514 |
||
Constancia |
4,826 |
4,266 |
3,261 |
3,187 |
3,315 |
2,947 |
2,498 |
2,332 |
||
San Dimas 4 |
10,290 |
10,092 |
10,642 |
5,726 |
- |
- |
- |
- |
||
Stillwater |
3,137 |
3,472 |
6,376 |
- |
- |
- |
- |
- |
||
Other |
||||||||||
Minto 5 |
- |
1,441 |
2,546 |
2,554 |
2,707 |
3,328 |
6,105 |
6,063 |
||
777 |
4,445 |
4,248 |
4,124 |
4,982 |
5,645 |
5,478 |
5,114 |
6,259 |
||
Total Other |
4,445 |
5,689 |
6,670 |
7,536 |
8,352 |
8,806 |
11,219 |
12,322 |
||
Total gold ounces produced |
93,585 |
107,160 |
102,107 |
86,874 |
76,691 |
96,474 |
95,216 |
79,636 |
||
Silver ounces produced 2 |
||||||||||
San Dimas 4 |
- |
- |
- |
607 |
1,606 |
1,324 |
1,043 |
973 |
||
Peñasquito |
1,595 |
1,455 |
1,050 |
1,267 |
1,450 |
1,561 |
1,641 |
1,483 |
||
Antamina |
1,180 |
1,225 |
1,406 |
1,394 |
1,304 |
1,434 |
1,686 |
1,832 |
||
Constancia |
588 |
695 |
682 |
552 |
598 |
621 |
572 |
506 |
||
Other |
||||||||||
Los Filos |
38 |
29 |
21 |
33 |
29 |
48 |
43 |
42 |
||
Zinkgruvan |
479 |
608 |
530 |
453 |
565 |
619 |
710 |
493 |
||
Yauliyacu |
528 |
233 |
597 |
719 |
550 |
335 |
588 |
607 |
||
Stratoni |
143 |
149 |
165 |
211 |
137 |
131 |
137 |
171 |
||
Minto 5 |
- |
8 |
25 |
30 |
35 |
30 |
43 |
42 |
||
Neves-Corvo |
498 |
509 |
458 |
421 |
405 |
305 |
341 |
316 |
||
Aljustrel |
470 |
475 |
514 |
138 |
- |
- |
- |
- |
||
Cozamin 6 |
- |
- |
- |
- |
- |
- |
- |
17 |
||
Lagunas Norte 7 |
- |
- |
- |
- |
217 |
253 |
243 |
218 |
||
Pierina 7 |
- |
- |
- |
- |
107 |
111 |
107 |
114 |
||
Veladero 7 |
- |
- |
- |
- |
265 |
211 |
201 |
144 |
||
777 |
95 |
113 |
136 |
152 |
146 |
146 |
145 |
138 |
||
Total Other |
2,251 |
2,124 |
2,446 |
2,157 |
2,456 |
2,189 |
2,558 |
2,302 |
||
Total silver ounces produced |
5,614 |
5,499 |
5,584 |
5,977 |
7,414 |
7,129 |
7,500 |
7,096 |
||
Palladium ounces produced ² |
||||||||||
Stillwater |
4,729 |
5,869 |
8,817 |
- |
- |
- |
- |
- |
||
GEOs produced 8 |
165,819 |
177,808 |
178,126 |
162,522 |
170,203 |
189,909 |
194,019 |
176,786 |
||
SEOs produced 8 |
13,888 |
15,009 |
14,394 |
12,840 |
13,495 |
14,491 |
14,728 |
12,913 |
||
Gold / Silver Ratio 8 |
83.8 |
84.4 |
80.8 |
79.0 |
79.3 |
76.3 |
75.9 |
73.0 |
||
Palladium / Silver Ratio 8 |
92.1 |
79.1 |
63.4 |
59.2 |
61.8 |
59.3 |
53.5 |
47.7 |
||
Gold / Palladium Ratio 8 |
0.9 |
1.1 |
1.3 |
1.3 |
1.3 |
1.3 |
1.4 |
1.5 |
||
Average payable rate 2 |
||||||||||
Gold |
95.6% |
95.5% |
95.2% |
94.7% |
94.4% |
94.8% |
94.8% |
94.5% |
||
Silver |
82.9% |
83.1% |
83.5% |
86.8% |
89.7% |
90.1% |
90.0% |
91.0% |
||
Palladium |
98.5% |
96.4% |
94.6% |
n.a. |
n.a. |
n.a. |
n.a. |
n.a. |
1) |
All figures in thousands except gold and palladium ounces produced. |
2) |
Ounces produced represent the quantity of gold, silver and palladium contained in concentrate or doré prior to smelting or refining deductions. Production figures and average payable rates are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received. |
3) |
Comprised of the Coleman, Copper Cliff, Garson, Stobie, Creighton and Totten gold interests. The Stobie gold interest was placed into care and maintenance as of May 2017. |
4) |
Pursuant to the San Dimas SPA with Primero, the Company acquired 100% of the payable silver produced at San Dimas up to 6 million ounces annually, and 50% of any excess for the life of the mine. The San Dimas SPA was terminated on May 10, 2018 and concurrently the Company entered into the new San Dimas PMPA. |
5) |
The Minto mine was placed into care and maintenance in October 2018. |
6) |
The Cozamin precious metal purchase agreement expired on April 4, 2017. |
7) |
In accordance with the Pascua-Lama precious metal purchase agreement, all deliveries from Lagunas Norte, Pierina and Veladero ceased effective March 31, 2018. |
8) |
GEOs and SEOs are provided to assist the reader. GEOs are calculated by converting silver to a gold equivalent by using the ratio of the average price of gold to the average price of silver and by converting palladium to a gold equivalent by using the average price of gold to the average price of palladium. SEOs are calculated by converting gold to a silver equivalent by using the ratio of the average price of gold to the average price of silver and by converting palladium to a silver equivalent by using the average price of palladium to the average price of silver. Average prices are as per the LBMA during the period. |
Summary of Ounces Sold
Q1 2019 |
Q4 2018 |
Q3 2018 |
Q2 2018 |
Q1 2018 |
Q4 2017 |
Q3 2017 |
Q2 2017 |
|||
Gold ounces sold |
||||||||||
Sudbury 2 |
4,061 |
4,864 |
2,560 |
4,400 |
5,186 |
12,059 |
3,237 |
5,822 |
||
Salobo |
84,160 |
75,351 |
65,139 |
70,734 |
54,645 |
71,683 |
67,198 |
50,478 |
||
Constancia |
5,512 |
3,645 |
2,980 |
2,172 |
3,247 |
1,965 |
2,206 |
2,356 |
||
San Dimas 3 |
11,510 |
8,453 |
9,771 |
3,738 |
- |
- |
- |
- |
||
Stillwater |
2,856 |
3,473 |
2,075 |
- |
- |
- |
- |
- |
||
Other |
||||||||||
Minto 4 |
3,307 |
2,674 |
796 |
2,284 |
1,763 |
2,020 |
4,603 |
6,988 |
||
777 |
3,614 |
4,353 |
5,921 |
3,812 |
5,132 |
6,568 |
5,304 |
6,321 |
||
Total Other |
6,921 |
7,027 |
6,717 |
6,096 |
6,895 |
8,588 |
9,907 |
13,309 |
||
Total gold ounces sold |
115,020 |
102,813 |
89,242 |
87,140 |
69,973 |
94,295 |
82,548 |
71,965 |
||
Silver ounces sold |
||||||||||
San Dimas 3 |
- |
- |
- |
1,070 |
1,372 |
1,299 |
962 |
845 |
||
Peñasquito |
1,164 |
901 |
1,241 |
1,547 |
1,227 |
1,537 |
1,109 |
1,639 |
||
Antamina |
1,255 |
1,300 |
1,333 |
1,422 |
1,413 |
1,769 |
1,537 |
1,453 |
||
Constancia |
735 |
629 |
567 |
410 |
574 |
491 |
491 |
559 |
||
Other |
||||||||||
Los Filos |
38 |
15 |
27 |
35 |
52 |
16 |
43 |
42 |
||
Zinkgruvan |
232 |
543 |
326 |
297 |
391 |
597 |
305 |
398 |
||
Yauliyacu |
15 |
317 |
697 |
521 |
360 |
642 |
364 |
423 |
||
Stratoni |
80 |
78 |
125 |
171 |
148 |
110 |
84 |
123 |
||
Minto 4 |
30 |
22 |
- |
28 |
(1) |
34 |
43 |
39 |
||
Cozamin 5 |
- |
- |
- |
- |
- |
- |
23 |
125 |
||
Neves-Corvo |
265 |
240 |
234 |
178 |
169 |
119 |
117 |
114 |
||
Aljustrel |
381 |
226 |
302 |
- |
- |
- |
- |
- |
||
Lagunas Norte 6 |
- |
- |
1 |
65 |
236 |
237 |
242 |
204 |
||
Pierina 6 |
- |
- |
- |
54 |
88 |
106 |
102 |
136 |
||
Veladero 6 |
- |
- |
2 |
104 |
161 |
211 |
201 |
144 |
||
777 |
99 |
129 |
163 |
70 |
153 |
124 |
135 |
125 |
||
Total Other |
1,140 |
1,570 |
1,877 |
1,523 |
1,757 |
2,196 |
1,659 |
1,873 |
||
Total silver ounces sold |
4,294 |
4,400 |
5,018 |
5,972 |
6,343 |
7,292 |
5,758 |
6,369 |
||
Palladium ounces sold |
||||||||||
Stillwater |
5,189 |
5,049 |
3,668 |
- |
- |
- |
- |
- |
||
GEOs sold 7 |
171,992 |
159,667 |
154,222 |
162,715 |
149,987 |
189,882 |
158,401 |
159,161 |
||
SEOs sold 7 |
14,405 |
13,478 |
12,462 |
12,855 |
11,892 |
14,488 |
12,024 |
11,625 |
||
Cumulative payable gold ounces PBND 8 |
51,515 |
77,074 |
77,588 |
70,259 |
75,153 |
72,707 |
75,862 |
67,827 |
||
Cumulative payable silver ounces PBND 8 |
3,544 |
3,184 |
3,015 |
3,375 |
4,126 |
3,828 |
4,661 |
3,662 |
||
Cumulative payable palladium ounces PBND 8 |
4,754 |
5,282 |
4,671 |
- |
- |
- |
- |
- |
||
Gold / Silver Ratio 7 |
83.8 |
84.4 |
80.8 |
79.0 |
79.3 |
76.3 |
75.9 |
73.0 |
||
Palladium / Silver Ratio 7 |
92.1 |
79.1 |
63.4 |
59.2 |
61.8 |
59.3 |
53.5 |
47.7 |
||
Gold / Palladium Ratio 7 |
0.9 |
1.1 |
1.3 |
1.3 |
1.3 |
1.3 |
1.4 |
1.5 |
1) |
All figures in thousands except gold and palladium ounces sold. |
2) |
Comprised of the Coleman, Copper Cliff, Garson, Stobie, Creighton and Totten gold interests. The Stobie gold interest was placed into care and maintenance as of May 2017. |
3) |
Pursuant to the San Dimas SPA with Primero, the Company acquired 100% of the payable silver produced at San Dimas up to 6 million ounces annually, and 50% of any excess for the life of the mine. The San Dimas SPA was terminated on May 10, 2018 and concurrently the Company entered into the new San Dimas PMPA. |
4) |
The Minto mine was placed into care and maintenance in October 2018. |
5) |
The Cozamin precious metal purchase agreement expired on April 4, 2017. |
6) |
In accordance with the Pascua-Lama precious metal purchase agreement, all deliveries from Lagunas Norte, Pierina and Veladero ceased effective March 31, 2018. |
7) |
GEOs and SEOs are provided to assist the reader. GEOs are calculated by converting silver to a gold equivalent by using the ratio of the average price of gold to the average price of silver and by converting palladium to a gold equivalent by using the average price of gold to the average price of palladium. SEOs are calculated by converting gold to a silver equivalent by using the ratio of the average price of gold to the average price of silver and by converting palladium to a silver equivalent by using the average price of palladium to the average price of silver. Average prices are as per the LBMA during the period. |
8) |
Payable gold, silver and palladium ounces produced but not yet delivered ("PBND") are based on management estimates. These figures may be updated in future periods as additional information is received. |
Results of Operations
The operating results of the Company's reportable operating segments are summarized in the tables and commentary below.
Three Months Ended March 31, 2019 |
||||||||||||||||
Ounces |
Ounces |
Average |
Average |
Average |
Sales |
Net |
Cash Flow |
Total |
||||||||
Gold |
||||||||||||||||
Sudbury 4 |
10,041 |
4,061 |
$ |
1,297 |
$ |
400 |
$ |
819 |
$ |
5,267 |
$ |
315 |
$ |
3,642 |
$ |
363,136 |
Salobo |
60,846 |
84,160 |
1,308 |
404 |
383 |
110,070 |
43,822 |
76,070 |
2,673,812 |
|||||||
Constancia |
4,826 |
5,512 |
1,311 |
400 |
361 |
7,227 |
3,031 |
5,135 |
115,556 |
|||||||
San Dimas |
10,290 |
11,510 |
1,314 |
600 |
310 |
15,130 |
4,661 |
8,224 |
204,632 |
|||||||
Stillwater |
3,137 |
2,856 |
1,303 |
234 |
519 |
3,721 |
1,570 |
3,052 |
234,946 |
|||||||
Other 5 |
4,445 |
6,921 |
1,298 |
372 |
241 |
8,984 |
4,739 |
6,733 |
19,691 |
|||||||
93,585 |
115,020 |
$ |
1,308 |
$ |
417 |
$ |
385 |
$ |
150,399 |
$ |
58,138 |
$ |
102,856 |
$ |
3,611,773 |
|
Silver |
||||||||||||||||
Peñasquito |
1,595 |
1,164 |
$ |
15.72 |
$ |
4.21 |
$ |
3.06 |
$ |
18,301 |
$ |
9,835 |
$ |
13,401 |
$ |
385,156 |
Antamina |
1,180 |
1,255 |
15.63 |
3.10 |
8.73 |
19,614 |
4,770 |
15,580 |
699,120 |
|||||||
Constancia |
588 |
735 |
15.48 |
5.90 |
7.50 |
11,372 |
1,528 |
7,684 |
240,721 |
|||||||
Other 6 |
2,251 |
1,140 |
15.68 |
5.96 |
1.43 |
17,875 |
9,450 |
10,805 |
501,012 |
|||||||
5,614 |
4,294 |
$ |
15.64 |
$ |
4.64 |
$ |
5.05 |
$ |
67,162 |
$ |
25,583 |
$ |
47,470 |
$ |
1,826,009 |
|
Palladium |
||||||||||||||||
Stillwater |
4,729 |
5,189 |
$ |
1,443 |
$ |
254 |
$ |
470 |
$ |
7,488 |
$ |
3,733 |
$ |
6,171 |
$ |
257,250 |
Cobalt |
||||||||||||||||
Voisey's Bay |
- |
- |
$ |
n.a. |
$ |
n.a. |
$ |
n.a. |
$ |
- |
$ |
- |
$ |
- |
$ |
393,422 |
Operating results |
$ |
225,049 |
$ |
87,454 |
$ |
156,497 |
$ |
6,088,454 |
||||||||
Other |
||||||||||||||||
General and administrative |
$ |
(16,535) |
$ |
(24,700) |
||||||||||||
Finance costs |
(13,946) |
(11,246) |
||||||||||||||
Other |
266 |
1,205 |
||||||||||||||
Income tax recovery |
110 |
(3,562) |
||||||||||||||
Total Other |
$ |
(30,105) |
$ |
(38,303) |
$ |
390,246 |
||||||||||
$ |
57,349 |
$ |
118,194 |
$ |
6,478,700 |
1) |
All figures in thousands except gold and palladium ounces produced and sold and per ounce amounts. |
2) |
Ounces produced represent the quantity of gold, silver and palladium contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received. |
3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release. |
4) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests, the non-operating Stobie and Victor gold interests. |
5) |
Comprised of the operating 777 gold interest in addition to the non-operating Rosemont and Minto gold interests. The Minto mine was placed into care and maintenance in October 2018. |
6) |
Comprised of the operating Los Filos, Zinkgruvan, Yauliyacu, Stratoni, Neves-Corvo, Aljustrel and 777 silver interests as well as the non-operating Keno Hill, Minto, Loma de La Plata, Pascua-Lama and Rosemont silver interests. The Minto mine was placed into care and maintenance in October 2018. |
On a gold equivalent and silver equivalent basis, results for the Company for the three months ended March 31, 2019 were as follows:
Three Months Ended March 31, 2019 |
|||||||
Ounces |
Ounces |
Average |
Average |
Cash |
Average |
Gross |
|
Gold equivalent basis |
165,819 |
171,992 |
$ 1,308 |
$ 402 |
$ 906 |
$ 398 |
$ 508 |
Silver equivalent basis |
13,888 |
14,405 |
$ 15.62 |
$ 4.80 |
$ 10.82 |
$ 4.75 |
$ 6.07 |
1) |
Ounces produced represent the quantity of gold, silver and palladium contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received. |
2) |
Silver ounces produced and sold in thousands. |
3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release. |
4) |
Refer to discussion on non-IFRS measure (iv) at the end of this press release. |
Three Months Ended March 31, 2018 |
||||||||||||||||
Ounces |
Ounces |
Average |
Average |
Average |
Sales |
Net |
Cash Flow |
Total |
||||||||
Gold |
||||||||||||||||
Sudbury 4 |
3,511 |
5,186 |
$ |
1,331 |
$ |
400 |
$ |
795 |
$ |
6,901 |
$ |
702 |
$ |
4,949 |
$ |
375,864 |
Salobo |
61,513 |
54,645 |
1,333 |
400 |
386 |
72,835 |
29,875 |
50,977 |
2,787,630 |
|||||||
Constancia |
3,315 |
3,247 |
1,328 |
400 |
374 |
4,311 |
1,798 |
3,012 |
120,837 |
|||||||
Other 5 |
8,352 |
6,895 |
1,311 |
389 |
405 |
9,039 |
3,564 |
5,150 |
29,025 |
|||||||
76,691 |
69,973 |
$ |
1,330 |
$ |
399 |
$ |
418 |
$ |
93,086 |
$ |
35,939 |
$ |
64,088 |
$ |
3,313,356 |
|
Silver |
||||||||||||||||
San Dimas 6 |
1,606 |
1,372 |
$ |
16.71 |
$ |
4.32 |
$ |
1.46 |
$ |
22,921 |
$ |
14,986 |
$ |
16,994 |
$ |
132,853 |
Peñasquito |
1,450 |
1,227 |
16.81 |
4.17 |
2.96 |
20,620 |
11,878 |
15,504 |
399,624 |
|||||||
Antamina |
1,304 |
1,413 |
16.82 |
3.41 |
8.70 |
23,771 |
6,660 |
18,951 |
745,348 |
|||||||
Constancia |
598 |
574 |
16.68 |
5.90 |
7.14 |
9,579 |
2,087 |
6,190 |
257,700 |
|||||||
Other 7 |
2,456 |
1,757 |
16.65 |
5.26 |
3.42 |
29,275 |
14,023 |
20,023 |
517,131 |
|||||||
7,414 |
6,343 |
$ |
16.73 |
$ |
4.49 |
$ |
4.42 |
$ |
106,166 |
$ |
49,634 |
$ |
77,662 |
$ |
2,052,656 |
|
Operating results |
$ |
199,252 |
$ |
85,573 |
$ |
141,750 |
$ |
5,366,012 |
||||||||
Other |
||||||||||||||||
General and administrative |
$ |
(9,757) |
$ |
(9,818) |
||||||||||||
Finance costs |
(7,107) |
(6,536) |
||||||||||||||
Other |
(1,071) |
(6) |
||||||||||||||
Income tax recovery |
485 |
(50) |
||||||||||||||
Total other |
$ |
(17,450) |
$ |
(16,410) |
$ |
271,715 |
||||||||||
$ |
68,123 |
$ |
125,340 |
$ |
5,637,727 |
1) |
All figures in thousands except gold ounces produced and sold and per ounce amounts. |
2) |
Ounces produced represent the quantity of gold and silver contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received. |
3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release. |
4) |
Comprised of the operating Coleman, Copper Cliff, Garson, Creighton and Totten gold interests, the non-operating Stobie and Victor gold interests. |
5) |
Comprised of the operating Minto and 777 gold interests in addition to the non-operating Rosemont gold interest. The Minto mine was placed into care and maintenance in October 2018. |
6) |
Pursuant to the San Dimas SPA with Primero, the Company acquired 100% of the payable silver produced at San Dimas up to 6 million ounces annually, and 50% of any excess for the life of the mine. On May 10, 2018, the Company terminated the San Dimas SPA and concurrently entered into the new San Dimas PMPA. |
7) |
Comprised of the operating Los Filos, Zinkgruvan, Yauliyacu, Stratoni, Minto, Neves-Corvo, Lagunas Norte, Pierina, Veladero and 777 silver interests as well as the non-operating Keno Hill, Aljustrel, Loma de La Plata, Pascua-Lama and Rosemont silver interests. In accordance with the Pascua-Lama PMPA, all deliveries from Lagunas Norte, Pierina and Veladero ceased effective March 31, 2018. Additionally, the Minto mine was placed into care and maintenance in October 2018. |
On a gold equivalent and silver equivalent basis, results for the Company for the three months ended March 31, 2018 were as follows:
Three Months Ended March 31, 2018 |
|||||||
Ounces Produced 1, 2 |
Ounces |
Average |
Average |
Cash |
Average |
Gross |
|
Gold equivalent basis |
170,203 |
149,987 |
$ 1,328 |
$ 376 |
$ 952 |
$ 382 |
$ 570 |
Silver equivalent basis |
13,495 |
11,892 |
$ 16.75 |
$ 4.74 |
$ 12.01 |
$ 4.82 |
$ 7.19 |
1) |
Ounces produced represent the quantity of gold and silver contained in concentrate or doré prior to smelting or refining deductions. Production figures are based on information provided by the operators of the mining operations to which the mineral stream interests relate or management estimates in those situations where other information is not available. Certain production figures may be updated in future periods as additional information is received. |
2) |
Silver ounces produced and sold in thousands. |
3) |
Refer to discussion on non-IFRS measure (iii) at the end of this press release. |
4) |
Refer to discussion on non-IFRS measure (iv) at the end of this press release. |
Non-IFRS Measures
Wheaton Precious Metals has included, throughout this document, certain non-IFRS performance measures, including (i) adjusted net earnings and adjusted net earnings per share; (ii) operating cash flow per share (basic and diluted); (iii) average cash costs of gold, silver and palladium on a per ounce basis and; (iv) cash operating margin.
i. Adjusted net earnings and adjusted net earnings per share are calculated by removing the effects of the non-cash impairment charges, non-cash fair value (gains) losses, non-cash share of losses of associates and other one-time (income) expenses. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, management and certain investors use this information to evaluate the Company's performance.
The following table provides a reconciliation of adjusted net earnings and adjusted net earnings per share (basic and diluted).
Three Months Ended |
||||||
(in thousands, except for per share amounts) |
2019 |
2018 |
||||
Net earnings |
$ |
57,349 |
$ |
68,123 |
||
Add back (deduct): |
||||||
Share in losses of associate |
62 |
201 |
||||
Loss on fair value adjustment of share purchase warrants held |
- |
99 |
||||
(Gain) loss on fair value adjustment of Kutcho Convertible Note |
(871) |
1,388 |
||||
Fees for contract amendments and reconciliations |
- |
(248) |
||||
Adjusted net earnings |
$ |
56,540 |
$ |
69,563 |
||
Divided by: |
||||||
Basic weighted average number of shares outstanding |
444,389 |
442,728 |
||||
Diluted weighted average number of shares outstanding |
445,121 |
443,181 |
||||
Equals: |
||||||
Adjusted earnings per share - basic |
$ |
0.13 |
$ |
0.16 |
||
Adjusted earnings per share - diluted |
$ |
0.13 |
$ |
0.16 |
ii. Operating cash flow per share (basic and diluted) is calculated by dividing cash generated by operating activities by the weighted average number of shares outstanding (basic and diluted). The Company presents operating cash flow per share as management and certain investors use this information to evaluate the Company's performance in comparison to other companies in the precious metal mining industry who present results on a similar basis.
The following table provides a reconciliation of operating cash flow per share (basic and diluted).
Three Months Ended |
||||||
(in thousands, except for per share amounts) |
2019 |
2018 |
||||
Cash generated by operating activities |
$ |
118,194 |
$ |
125,340 |
||
Divided by: |
||||||
Basic weighted average number of shares outstanding |
444,389 |
442,728 |
||||
Diluted weighted average number of shares outstanding |
445,121 |
443,181 |
||||
Equals: |
||||||
Operating cash flow per share - basic |
$ |
0.27 |
$ |
0.28 |
||
Operating cash flow per share - diluted |
$ |
0.27 |
$ |
0.28 |
iii. Average cash cost of gold, silver and palladium on a per ounce basis is calculated by dividing the total cost of sales, less depletion, by the ounces sold. In the precious metal mining industry, this is a common performance measure but does not have any standardized meaning. In addition to conventional measures prepared in accordance with IFRS, management and certain investors use this information to evaluate the Company's performance and ability to generate cash flow.
The following table provides a reconciliation of average cash cost of gold, silver and palladium on a per ounce basis.
Three Months Ended |
||||||
(in thousands, except for gold and palladium ounces sold and per ounce amounts) |
2019 |
2018 |
||||
Cost of sales |
$ |
137,595 |
$ |
113,679 |
||
Less: depletion |
(68,381) |
(57,265) |
||||
Cash cost of sales |
$ |
69,214 |
$ |
56,414 |
||
Cash cost of sales is comprised of: |
||||||
Total cash cost of gold sold |
$ |
47,982 |
$ |
27,914 |
||
Total cash cost of silver sold |
19,915 |
28,500 |
||||
Total cash cost of palladium sold |
1,317 |
- |
||||
Total cash cost of sales |
$ |
69,214 |
$ |
56,414 |
||
Divided by: |
||||||
Total gold ounces sold |
115,020 |
69,973 |
||||
Total silver ounces sold |
4,294 |
6,343 |
||||
Total palladium ounces sold |
5,189 |
- |
||||
Equals: |
||||||
Average cash cost of gold (per ounce) |
$ |
417 |
$ |
399 |
||
Average cash cost of silver (per ounce) |
$ |
4.64 |
$ |
4.49 |
||
Average cash cost of palladium (per ounce) |
$ |
254 |
$ |
n.a. |
iv. Cash operating margin is calculated by subtracting the average cash cost of gold, silver and palladium on a per ounce basis from the average realized selling price of gold, silver and palladium on a per ounce basis. The Company presents cash operating margin as management and certain investors use this information to evaluate the Company's performance in comparison to other companies in the precious metal mining industry who present results on a similar basis as well as to evaluate the Company's ability to generate cash flow.
The following table provides a reconciliation of cash operating margin.
Three Months Ended |
||||||
(in thousands, except for gold and palladium ounces sold and per ounce amounts) |
2019 |
2018 |
||||
Total sales: |
||||||
Gold |
$ |
150,399 |
$ |
93,086 |
||
Silver |
$ |
67,162 |
$ |
106,166 |
||
Palladium |
$ |
7,488 |
$ |
- |
||
Divided by: |
||||||
Total gold ounces sold |
115,020 |
69,973 |
||||
Total silver ounces sold |
4,294 |
6,343 |
||||
Total palladium ounces sold |
5,189 |
- |
||||
Equals: |
||||||
Average realized price of gold (per ounce) |
$ |
1,308 |
$ |
1,330 |
||
Average realized price of silver (per ounce) |
$ |
15.64 |
$ |
16.73 |
||
Average realized price of palladium (per ounce) |
$ |
1,443 |
$ |
n.a. |
||
Less: |
||||||
Average cash cost of gold 1 (per ounce) |
$ |
(417) |
$ |
(399) |
||
Average cash cost of silver 1 (per ounce) |
$ |
(4.64) |
$ |
(4.49) |
||
Average cash cost of palladium 1 (per ounce) |
$ |
(254) |
$ |
n.a. |
||
Equals: |
||||||
Cash operating margin per gold ounce sold |
$ |
891 |
$ |
931 |
||
As a percentage of realized price of gold |
68% |
70% |
||||
Cash operating margin per silver ounce sold |
$ |
11.00 |
$ |
12.24 |
||
As a percentage of realized price of silver |
70% |
73% |
||||
Cash operating margin per palladium ounce sold |
$ |
1,189 |
$ |
n.a. |
||
As a percentage of realized price of palladium |
82% |
n.a. |
1) Please refer to non-IFRS measure (iii), above. |
These non-IFRS measures do not have any standardized meaning prescribed by IFRS, and other companies may calculate these measures differently. The presentation of these non-IFRS measures is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For more detailed information, please refer to Wheaton Precious Metals' MD&A available on the Company's website at www.wheatonpm.com and posted on SEDAR at www.sedar.com.
CAUTIONARY NOTE REGARDING FORWARD LOOKING-STATEMENTS
The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking statements, which are all statements other than statements of historical fact, include, but are not limited to, statements with respect to:
Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", "potential", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Wheaton to be materially different from those expressed or implied by such forward-looking statements, including but not limited to:
Forward-looking statements are based on assumptions management currently believes to be reasonable, including but not limited to:
Although Wheaton has attempted to identify important factors that could cause actual results, level of activity, performance or achievements to differ materially from those contained in forward-looking statements, there may be other factors that cause results, level of activity, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate and even if events or results described in the forward-looking statements are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, Wheaton. Accordingly, readers should not place undue reliance on forward-looking statements and are cautioned that actual outcomes may vary. The forward-looking statements included herein are for the purpose of providing investors with information to assist them in understanding Wheaton's expected financial and operational performance and may not be appropriate for other purposes. Any forward looking statement speaks only as of the date on which it is made. Wheaton does not undertake to update any forward-looking statements that are included or incorporated by reference herein, except in accordance with applicable securities laws.
Cautionary Language Regarding Reserves And Resources
For further information on Mineral Reserves and Mineral Resources and on Wheaton more generally, readers should refer to Wheaton's Annual Information Form for the year ended December 31, 2017 and other continuous disclosure documents filed by Wheaton since January 1, 2018, available on SEDAR at www.sedar.com. Wheaton's Mineral Reserves and Mineral Resources are subject to the qualifications and notes set forth therein. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.
Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources: The information contained herein has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of United States securities laws. The terms "mineral reserve", "proven mineral reserve" and "probable mineral reserve" are Canadian mining terms defined in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the "CIM Standards"). These definitions differ from the definitions in Industry Guide 7 ("SEC Industry Guide 7") under the U.S. Securities Act of 1933, as amended (the "U.S. Securities Act"). Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Also, under SEC Industry Guide 7 standards, a "final" or "bankable" feasibility study is required to report reserves, the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority. In addition, the terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in and required to be disclosed by NI 43-101; however, these terms are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures. Accordingly, information contained herein that describes Wheaton's mineral deposits may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. United States investors are urged to consider closely the disclosure in Wheaton's Form 40-F, a copy of which may be obtained from Wheaton or from http://www.sec.gov/edgar.shtml.
In accordance with the Company's MD&A and financial statements, reference to the Company includes the Company's wholly owned subsidiaries.